Live casino uptime and SLA terms: what the 99.9% actually covers

    A 99.9% live casino SLA allows 43 minutes a month: what counts and what slips through

    By Matteo RuskavellNovember 21, 20268 min read

    A game-launch API can be healthy while a live table is unusable. The lobby opens, the player reaches the table, and the video freezes. Whether that incident breaches the supplier's SLA depends on what the contract calls available, not on how convincing the uptime percentage looks.

    So what does 99.9% cover? Only the minutes the service schedule defines as qualifying downtime, measured at the point and with the thresholds the schedule names, for the components it lists. Everything outside that definition, from a frozen stream on one branded table to a run of four-minute stalls, can leave the report at 100%. The work before signing is to write that definition, test it on a realistic failure and check what the remedy pays.

    Which failures the percentage counts

    Live casino is four services that fail independently: game launch, video delivery, bet acceptance and settlement. A video interruption does not establish that a bet failed, and a responsive stream does not establish that the wallet received the settlement. Each commitment needs its component, its studio or table group, the affected markets and the measurement point.

    For a time-based measure, availability is eligible service time minus qualifying downtime, divided by eligible service time. A request-success measure (valid bets accepted divided by valid bets submitted) has a different denominator and should not be labelled as a time measure. A quiet table with no bet requests provides no evidence of either success or failure, which is why request-based metrics flatter low-traffic tables overnight.

    Contract question Detail to put in the schedule
    What is unavailable? Failed launch, missing stream, rejected valid transactions or delayed settlement; define each separately
    How broad must the failure be? A named table, studio, market or the whole service
    When does an incident start and end? Monitoring interval, persistence threshold, recovery criterion and timestamp source
    What is excluded? Maintenance, operator faults and network dependencies, with evidence needed to invoke each exclusion
    Who resolves a measurement dispute? Named owners, shared logs, a reconciliation deadline and an escalation route

    The measurement point decides whose problem a failure is. A probe inside the supplier's data centre sees the encoder; it does not see a CDN edge that drops the stream for players in one country. Ask where the supplier measures, and run your own synthetic checks from the markets you serve: launch a test session on each table group every minute or two and record whether video frames and a bet acknowledgement come back. Where the two sets of logs disagree, the schedule should say which one prevails, or how the parties reconcile them.

    43 minutes a month, and the incidents that never reach the report

    With no excluded time, a 30-day month contains 43,200 minutes. The figures below are arithmetic, not claims about any provider's contract.

    Monthly target Downtime at the target
    99.5% 216 minutes
    99.9% 43.2 minutes
    99.95% 21.6 minutes
    99.99% 4.32 minutes

    A qualifying 70-minute outage gives (43,200 - 70) / 43,200, about 99.838% availability, and breaches a 99.9% target on that denominator. The same outage can pass once the contract excludes time or pools unaffected services, so calculate with the agreed formula and not with a rounded headline.

    Pooling hides the most. Take 40 tables measured time-weighted over the month, and one dedicated branded table dark for 600 minutes on a Saturday night. The pooled figure is 1 - 600 / (40 × 43,200), about 99.965%, comfortably above 99.9%. The table itself ran at 42,600 / 43,200, about 98.61%. If the branded table carries your VIP traffic, the pooled number tells you nothing you need. Per-table commitments reveal local failures at the price of heavier reporting, so a sensible compromise is a pooled target for the whole service plus a per-table floor for named or dedicated tables.

    Persistence thresholds hide the rest. Many schedules count an incident only once it lasts a set number of consecutive minutes. If that threshold is five minutes, twelve separate four-minute stalls in an evening add up to 48 minutes of broken play and zero qualifying downtime. Players notice the stalls; the report does not. Either lower the threshold or add a second measure, such as the count of interruptions longer than 60 seconds, with its own target.

    What a service credit pays against what an outage costs

    Credits are the usual remedy, and their base matters as much as their percentage. In an illustrative model, monthly live GGR is EUR 400,000 and the supplier fee is 12%, or EUR 48,000. Suppose the schedule pays 5% of the monthly fee below 99.9%, 10% below 99.5% and 20% below 99.0%, capped at 20%.

    The 70-minute outage lands in the first band: 5% of EUR 48,000 is EUR 2,400. Now estimate exposure. Suppose 55% of that GGR falls in 150 peak hours; the historical average is about EUR 1,467 per peak hour, so 70 peak minutes represent roughly EUR 1,711 at that rate. Here the credit exceeds the proxy. Scale the outage to 600 minutes on the whole service during peak hours: availability falls to about 98.61%, the third band pays 20%, or EUR 9,600, while the proxy is ten peak hours, about EUR 14,667. The longer and more concentrated the outage, the further the credit falls behind.

    Treat the peak-hour figure as a planning proxy. Game variance, players who come back later and play moved to other tables all break a straight conversion from outage minutes to lost GGR, which is also why suppliers resist paying it.

    Three clauses decide whether credits are the whole story. Check whether credits are the "sole and exclusive remedy" for availability failures, which would bar any other claim for the same incident. Check whether credits are automatic or must be claimed within a deadline, since a 30-day claim window that nobody tracks turns every credit into zero. And ask for a termination right on repeated breach, for example three months below target in any six, because a supplier that pays small credits every month is still a supplier you may need to leave.

    Maintenance windows and recovery targets

    Ask for a maintenance notice period, permitted windows, a duration cap and treatment of overruns. Excluding maintenance from the formula does not make it harmless: a two-hour window at 02:00 Malta time falls in the evening peak for players in Latin America. A window should name its time zone and say what happens when European clocks change on the last Sundays of March and October, so a window fixed in UTC does not drift an hour into somebody's prime time. Overrun minutes beyond the cap should count as downtime.

    Distinguish acknowledgement from restoration. An acknowledgement target says somebody has taken responsibility; a restoration target concerns usable service. A recovery time objective, a term from business-continuity practice such as ISO 22301, is a planning objective. If the commercial agreement is meant to bind the supplier to it, write the trigger, scope, exceptions and the consequence of missing it.

    Interrupted rounds follow the rules, not the SLA

    For incidents, require affected game and round identifiers, timing, settlement status, mitigation and a root-cause report within an agreed number of days. Do not prescribe automatic voiding whenever video stops. In Great Britain, UKGC RTS 10 separates the cases: where the customer has no further influence on the outcome, the result should stand; for games with several decision points, all reasonable steps should be taken to restore the last known state; a single-stage event interrupted before an outcome returns the stake. A baccarat hand whose cards are already dealt and a blackjack hand awaiting the player's decision therefore end differently after the same outage. The SLA should commit the supplier to supply the round state you need to apply those rules, in whichever market you operate.

    Aggregators and dedicated tables

    An aggregator arrangement adds another service boundary. Read the operator-aggregator agreement alongside the supplier commitments it incorporates, and ask who receives incidents, who claims credits and who supplies round records. A pass-through credit clause on its own provides no monitoring, restoration or settlement support, and the aggregator's own uptime is a separate dependency with its own exclusions.

    Dedicated tables need a definition of scheduled hours and of what happens when one table is lost while the rest of the studio runs. A backup lobby may restore choice for the next bet. It cannot migrate an unfinished hand to another supplier, so interrupted-round handling stays separate from offering alternative games.

    Rehearse one incident before signing

    Before signing, walk the proposed schedule through one failure: a single studio loses video for 40 minutes on a Friday evening, bets have already been accepted on two tables, and another studio stays healthy. Work out what the report would show, which credit band applies, who notifies whom, and how the open rounds are settled. If the parties cannot agree on those answers, fix the clauses first. An extra decimal place in the uptime figure can wait.